St Matthew’s C of E Primary School, Smethwick

AMG have recently completed the Design & Build of a new two storey primary school for Sandwell MBC.

Following extensive demolition and enabling works the new building benefited from the speed and flexibility of our RoWeR system, constructed with engineered foundations, taking into account the existing cellars, culverts, local mine workings, and a bespoke structural steel frame.

The external walls comprised Trespa rainscreen cladding panels. The roof is made up of cold rolled steel & composite cladding insulation panels with a single ply membrane. Floors and stairs in precast / composite concrete. Internal walls are lightweight partition construction. Extensive new M&E installations, Lift, incoming services, drainage and external works comprising a new MUGA, new play areas, parking and highways modifications.

Project Value £3.8M

Design Team:
G.H. Design Ltd

Central Design Consultants Ltd

Sandwell Futures Ltd

Procurement Traditional competitive single stage selective tender JCT D&B

Location Windmill Lane, Smethwick, B66 3LX