Aviagen Industrial Unit

A large scale extension of the Client’s existing unit, doubling the size of their current facility, at Alscott Industrial Estate, Atherstone-on-Stour.

£9.6m

Project Value

Project Duration

Project New Industrial Unit

Location Stratford upon Avon

Client Aviagen Ltd

Project Description An extension of the Client’s existing unit, doubling the size of their current facility, at Alscott Industrial Estate, Atherstone-on-Stour, Stratford-upon-Avon.  A traditional steel frame structure with insulated composite steel roof and part wall cladding combined with masonry cavity walls. The ground floor of the building was a combination of precast concrete planks with a concrete screed and a reinforced concrete ground bearing slab. The extensive internal fit out of the building includes insulated steel composite hygienic wall and ceiling panel systems, polyurethane resin floors, office and welfare areas and extensive mechanical and electrical installations. The external works scheme is a combination of concrete yards, asphalt roads, and a complex below ground drainage system with SUDS and a new private sewage treatment plant.    

Project Value £9.6M

Project Duration 43 Weeks

Form of Contract JCT with Contractor Design

Design Team Corstorphine + Wright, Bridgewater and Coulton (Worcester), Shire Consulting, Engineering Services Design Practice, D.W Pointer & Partners Ltd

Procurement Competitive two stage tender